Systems

Grid-tie, hybrid or commercial

What each system includes, and who should not buy it. Every system starts with your bill and a survey of your roof.

Compare

Grid-tie, hybrid and commercial at a glance

FeatureGrid-tieHybridCommercial
Runs in a brownoutNo Shuts off for safety (anti-islanding)Yes For the backed-up loadsTypically no Unless a battery is added
BatteryNoneIncludedOptional, quoted separately
Best forDaytime-heavy homesNight use and brownout-prone areasShops, offices and daytime loads
Starting bandFrom ₱155,000From ₱318,000 (5 kW)Quoted after survey (10 kW from ₱420,000 as reference)
Net meteringYesYesYes Subject to the utility

Starting bands are planning figures, not a contract. The final price follows the site survey. How net metering works: net metering steps.

Grid-tie solar array
Grid-tie

Panels + grid-tie inverter

Solar power is used in your home first. When the panels make more than you use, the surplus goes to the grid and can earn a net-metering bill credit.

What it includes

  • Solar modules (brand and model named in your quote)
  • Grid-tie inverter
  • Roof mounting and rails
  • DC and AC protection devices: breakers, isolators, surge protection
  • Installation, testing and switch-on
  • Permits and the net-metering application with Meralco

Who should not buy it

  • You need power during brownouts. A grid-tie system shuts off when the grid is down (anti-islanding).
  • Most of your use is at night and you would export most of your solar.
  • Your roof needs repair first. Fix the roof, then install.
Solar panels seen from above
Hybrid

Panels + hybrid inverter + battery

A battery stores daytime solar for the evening and powers selected circuits when the grid is down. You choose which loads stay on.

What it includes

  • Solar modules (brand and model named in your quote)
  • Hybrid inverter
  • Battery (brand, model and usable capacity named)
  • Backup circuit for the loads you choose
  • Mounting, protection devices, installation and testing
  • Permits and net-metering filing, if you also export

Who should not buy it

  • Outages rarely affect you and your goal is purely a lower bill. Grid-tie usually pays back faster.
  • You expect the battery to run the whole house, including every aircon, all night.
  • Your budget only fits a battery by shrinking the panels too much.
Commercial rooftop solar
Commercial

Sized to business loads

For shops, offices and small facilities. We size against your demand pattern, roof area and operating hours, as grid-tie or hybrid.

What it includes

  • Load review from your recent bills
  • Site survey of roof structure and electrical room
  • Modules, inverter(s), mounting and protection devices
  • Installation, testing and switch-on
  • Permits and net-metering application where applicable
  • A walk-through for whoever manages the building

Who should not buy it

  • Your heaviest loads run at night and the building is closed by day.
  • You lease the space and the owner has not approved roof work.
  • The roof is due for replacement soon. Replace it first.
Hybrid backup

What can a 5 kWh battery keep on?

Tick the loads you want during a brownout. A 5 kWh battery covers lights, Wi-Fi and a fridge. Fans and a TV reduce the hours.

Not aircon. A 5 kWh home battery is not sized to run air conditioning. Aircon needs a much larger battery and inverter, quoted after survey.

Planning guide
Loads to back up

Assumed loads (yours may differ): LED lights 60 W total, Wi-Fi 15 W, fridge about 100 W average, two fans 120 W, TV 100 W. Battery: 5 kWh with about 4.5 kWh usable. Hours are battery-only; daytime solar recharges it.

Process

How a project runs

After switch-on: net metering and maintenance plans.

  1. 1

    Bill

    Send your latest Meralco bill. Your monthly use is the starting point for sizing.

  2. 2

    Survey

    We visit to check roof condition, orientation, shading, structure and your electrical panel.

  3. 3

    Written quote

    Every component named by brand, model and size, with warranties, exclusions and a timeline.

  4. 4

    Permits & net metering

    Building and electrical permits, then the net-metering application with Meralco for grid-tie systems.

  5. 5

    Switch-on

    Installation, testing and a walk-through of how to read your system’s output.

Not sure which type fits?

Request a site survey