Meralco rates are up 16% since January. Make your roof pay you back.
Book a free, no-obligation pre-site inspection. We check your roof, wiring and Meralco bill, then give you a written quote sized to how you actually use power.
- Permits and the Meralco net-metering file are handled for you
- Panel brand, inverter model and warranty named on your written quote
- Financing help: GSIS, Pag-IBIG and bank solar loans. We assist you with the application.
Meralco typical household rate, October 2026, up from ₱12.9508 in January 2026 (Meralco advisories).
Every month without solar is money you never get back.
Meralco's typical household rate rose from ₱12.9508/kWh in January 2026 to ₱15.0615/kWh in October 2026, a 16.3% increase in nine months. October alone added ₱0.3191/kWh, driven by higher generation charges.
more a month than in January for the same usage, on an ₱8,000 October bill (≈531 kWh at the January vs. October rate).
a year leaves the house on an ₱8,000/month bill, and none of it comes back. That bill pays for power. It builds nothing.
control over generation charges, fuel prices or the peso. Your rooftop output, though, is yours.
Assumes the whole bill is billed at Meralco's published typical-household rate. Real bills vary with your consumption level and charges. Rates can go down as well as up. Meralco says a refund of ₱0.1733/kWh for residential customers starts with November 2026 billing.
Imagine opening your Meralco bill and it's smaller every month, not bigger.
The aircon runs through a hot afternoon on power from your own roof. Extra solar goes to the grid as bill credit. When Meralco announces another increase, it hurts less, because you're buying far fewer kWh.
Even the DOE's own residential sizing guide aims grid-tie systems at a "zero bill or 100% offset" target. Whether your roof gets close depends on your usage, roof space and shade. That's exactly what the free inspection finds out.
What a properly sized system can do
- Cover much of your daytime use (aircon, ref, office loads)
- Earn net-metering credits that don't expire and roll over month to month
- With a hybrid battery, keep chosen circuits running in a brownout
- Shield part of your budget from future rate increases
Results depend on system size, roof, shading, weather and usage pattern. No specific bill is guaranteed.
Typical system size, savings and payback by monthly bill
Estimates only, not a quote
A conservative planning view. Your inspection and written quote set the real figures.
| Monthly Meralco bill | ≈ kWh / month | Typical size* | Planning price (from) | Est. savings / month | Est. simple payback |
|---|---|---|---|---|---|
| ₱5,000 | 332 | 3 kW grid-tie | ₱155,000 | ≈ ₱3,066 | ≈ 4.2 yrs |
| ₱8,000 | 531 | 5 kW grid-tie | ₱235,000 | ≈ ₱5,110 | ≈ 3.8 yrs |
| ₱12,000 | 797 | 5 kW grid-tie | ₱235,000 | ≈ ₱5,110 | ≈ 3.8 yrs |
| ₱20,000 | 1,328 | 10 kW grid-tie | ₱420,000 | ≈ ₱10,220 | ≈ 3.4 yrs |
| Mostly night use | - | 5 kW hybrid (with battery) | ₱318,000 | Priced and estimated at inspection | |
Assumptions (so you can check our math)
- Same basis as our homepage estimator: 4.2 kWh of solar output per installed kW per day.
- Value: each solar kWh is counted at ₱8, well below Meralco's ₱15.0615/kWh typical household rate for October 2026, because not every kWh is used at home and exports are credited at a lower rate.
- Price: Solarman PH 2026 published planning bands ("from" prices, before survey).
- Payback = planning price ÷ (monthly savings × 12). No financing cost, rate changes, panel degradation or maintenance included.
*How we pick a starting size
Solarman's rough guide: under ₱6,000/month suggests 3 kW; ₱6,000–14,000 suggests 5 kW; above ₱14,000 suggests 10 kW. Mostly-night use points to hybrid.
Final size depends on your actual kWh, roof area, orientation, shade and Meralco's hosting capacity for your transformer. Final price follows the site survey. Roof type, mounting, cable runs, battery size and brand can all change it.
Book. Inspect. Install.
Book
Pick a date and a 9:00 AM or 1:00 PM slot on our booking page. Have your latest Meralco bill handy. A photo is enough.
Inspect (free)
An engineer checks your roof, shading, wiring and service entrance, and reviews your bill. Then you get a written quote naming every brand, model, kW size, warranty and exclusion.
Install
Say yes only if the numbers work for you. We install, then file the LGU permits and the Meralco net-metering application, and show you how to read your output.
Typical timeline
Net-metering timing depends on your LGU and Meralco's evaluation (Distribution Impact Study, inspection, meter replacement). Bill credits start from successful testing and commissioning.
Limited inspection slots daily. When they're gone, they're gone.
Each inspection gets an engineer's full attention, so daily slots depend on how many of our engineers are scheduled that day. Visits start at 9:00 AM or 1:00 PM, Monday to Saturday. Book as early as tomorrow, or up to 60 days ahead.
Book my free inspectionFree · No obligation · Written quoteWe'd rather tell you "don't buy" than sell you the wrong system.
Sized to your bill
We size from your Meralco bill and an on-site survey, not a one-size package.
Everything in writing
Brand, model, kW, workmanship warranty and every exclusion. If it's not in writing, it's not part of the deal.
Permits & net metering included
LGU permits and the Meralco net-metering file are part of our standard scope.
Across Metro Manila
Serving homes and businesses across Metro Manila, plus surveyed roofs nationwide.
DOE-certified ESCO
SolarMan PH is a brand of WWC, a DOE-certified ESCO (Energy Service Company).
Talk to us
Call or WhatsApp 0960 899 1380, or email hello@solarmanph.com.
Named brands. Written warranties. Real after-sales.
Your written quote names the panel brand and model, the inverter model, the array size in kW, the warranties and every exclusion.
Grid-tie
Lowest cost to start. Panels power the home first, and surplus can earn net-metering credit. Shuts off in a brownout for line-worker safety (anti-islanding).
Hybrid (with battery)
Stores daytime solar for the evening and keeps chosen circuits running during outages. 5 kW hybrid from ₱318,000 (planning band).
Commercial
For shops, offices and small facilities whose heaviest loads run while the sun is up, the fastest fit for solar.
Your risk, reversed
- The inspection is free, and you owe nothing if you don't go ahead
- Written quote with every exclusion. No surprise add-ons after signing.
- After switch-on, we show you how to read your system's output and stay reachable for questions
Meralco net metering, explained in 60 seconds
Net metering comes from the Renewable Energy Act of 2008 (RA 9513) and ERC's net-metering rules, most recently amended by ERC Resolution No. 15, Series of 2025. It lets you use your solar first and send the excess to Meralco's grid for bill credit.
Who qualifies
- Solar PV up to 100 kWp
- Meralco account in the applicant's name
- No unpaid Meralco balance at application
How credits work
A bi-directional meter records what you import and export. Exported kWh × Meralco's monthly blended generation charge = your peso credit. Credits don't expire, roll over month to month, and can't be converted to cash. The export rate is lower than the full retail rate. That's why self-use matters most.
The process (we prepare and file it)
- Application form, signed Net-Metering Agreement, LGU CFEI (Certificate of Final Electrical Inspection)
- Meralco's Distribution Impact Study (DIS)
- Meralco inspection, then bi-directional meter replacement
- Testing & commissioning, then energization. Credits start from here.
Fees set by others: ERC COC fee ₱1,500; meter cost difference capped at ₱3,000 for residential (ERC advisory, Sept 22, 2025); LGU CFEI fees vary. Applying to Meralco itself is free. REC meter is optional under the 2025 rules.
No big cash-out? These loans can fund solar.
Verified from official and news sources as of October 15, 2026. All loans are subject to the lender's approval and terms. We can't guarantee approval, but we'll prepare the quotation and documents lenders ask for.
GSIS Ginhawa Solar Energy Loan (GSEL) Open
- Up to ₱500,000 for purchase and installation of residential solar, including equipment and installation
- 5% per year, up to 5 years (60 monthly payments); no service fee. ₱500,000 ≈ ₱10,416.67/month per GSIS.
- Active members (permanent, regular or non-career) with at least 3 years of government service; no defaulted GSIS loans except housing; net take-home pay rules apply
- Qualified GSIS pensioners can apply since Sept 30, 2026
- Apply via the GSIS Touch app with an installer's quotation/contract. 3 years of free insurance on the panels (fire, lightning, typhoon, earthquake) after proof of installation.
Sources: GSIS via GMA News (Mar 11, 2026), Philstar (Apr 26 & Oct 2, 2026)
SSS Energy Sustainability Loan Not open yet
- Planned solar loan for members with a Mandatory Provident Fund (MySSS Pension Booster) account, generally MSC above ₱20,000
- SSS's initial estimate: ₱200,000–₱400,000, payable over 4–7 years; interest not yet announced
- Guidelines targeted by December 2026; rollout planned Q1–Q2 2027
- Today, SSS's general Salary Loan is for short-term needs, not a solar program
Sources: SSS (May 22, 2026); GMA News (Sept 1, 2026)
Pag-IBIG Fund Open
- Home Improvement Loan: up to ₱300,000, for minor home improvements, no building permit needed, up to 5 years; ₱1,000 processing fee
- Housing loan: Pag-IBIG lets members use housing loans to buy or install solar panels, as a home improvement or built into a newly bought unit
- Amount depends on capacity to pay, project cost and Pag-IBIG requirements
Sources: Pag-IBIG Fund (pagibigfundservices.com); Cebu Daily News (Jun 23, 2026); Daily Tribune (Dec 7, 2025)
Bank solar loans Open
- BPI Solar Mortgage: top-up of your BPI housing loan (min ₱400,000, up to 20 yrs), property equity loan, or Multi-Purpose Loan using a fully paid car (min ₱200,000, up to 5 yrs). Solar quotation required.
- Security Bank Solar Mortgage: home loan plus solar; minimums ₱300,000 (top-up) to ₱1,000,000 (new-to-bank); listed rates 7.00% / 7.50% / 8.00% for 1/3/5-yr fixing; ₱50,000 minimum joint monthly income.
- BDO Home Loan: property-collateral loan that can fund solar panel purchase and installation; up to 80% of appraised value, up to 25 yrs; ₱50,000 minimum gross family income.
Sources: bpi.com.ph, securitybank.com, bdo.com.ph (accessed Oct 15, 2026). Rates and terms change. Confirm with the bank.
Business owners: ask us about financing for commercial systems.
Low effort, not zero effort
Solar has no moving parts. Main jobs: keep panels reasonably clean (dust and bird droppings cut output), check the inverter display or app, and have connections inspected periodically, especially after typhoon season.
A 5 kW system avoids about 5.2 tonnes of CO₂ a year Estimate
5 kWp × 1,402.1 kWh/kWp ≈ 7.0 MWh/year × DOE Luzon-Visayas grid emission factor of 0.7446 tCO₂/MWh (combined margin for solar, 2022–2024) ≈ 5.2 tCO₂/year.
Actual output and avoided emissions vary with your roof, shade and weather.
Questions people ask before they book
Is the inspection really free? What's the catch?
Yes, it's free and there's no obligation. Solar only makes sense if it's sized to your roof and bill, so we need to see both before quoting. You get a written quote. Accept it or don't. We limit each day's visits to the engineers on schedule so each one is done properly.
What happens during the inspection?
An engineer checks roof condition, orientation and shading, measures usable area, looks at your electrical panel and service entrance, and reviews your Meralco bill (kWh and daytime vs. night use). Please have your latest bill ready.
Solar is expensive. Is it worth it?
Our 2026 planning bands start from ₱155,000 (3 kW grid-tie). On the planning assumptions above, estimated simple payback is roughly 3.4 to 4.2 years: about 3.8 years for a 5 kW grid-tie system. After that, the panels keep producing. Financing (GSIS, Pag-IBIG, banks) can spread the cost so your monthly amortization sits next to a smaller bill. These are estimates, not guarantees. Your quote gives your real numbers.
Will it survive typhoons?
Mounting is designed and anchored for your roof type. GSIS GSEL borrowers also get 3 years of free insurance covering typhoon, fire, lightning and earthquake after submitting proof of installation. For other customers, we recommend adding the system to your home insurance.
Will drilling damage my roof or cause leaks?
The survey checks your roof's condition first. If it needs repair, we tell you before anything goes up (roof repair isn't in our standard scope). Penetrations are sealed.
Will I have power during a brownout?
Not with grid-tie alone: it shuts off automatically in an outage to protect line workers (anti-islanding, per Meralco). If outages matter to you, choose hybrid. A battery keeps chosen circuits running and stores daytime solar for the evening.
Do I need permits? Who handles Meralco?
Yes. An electrical permit and CFEI from your LGU, plus Meralco's net-metering application. Permits and the net-metering file are included in our standard scope. ERC/LGU/Meralco meter fees are paid to those offices.
How much maintenance does it need?
Periodic cleaning and a check of connections and the inverter. No moving parts. We show you how to read your output after switch-on.
How long from "yes" to switch-on?
Net-metering approval depends on your LGU and Meralco's evaluation. Your system can power your home after installation and safety checks. Export credits begin after Meralco's testing and commissioning.
Will I get approved for a GSIS / Pag-IBIG / bank loan?
We can't promise approval. Every loan is subject to the lender's approval and terms. We assist you with the application by preparing the itemized quotation, installation contract and technical documents lenders typically ask for.
Do you serve my area?
We serve homes and businesses across Metro Manila. Projects elsewhere are taken after a site survey.
Next month's Meralco bill is already on its way.
Find out what your roof can do before it lands. Free, no obligation, and slots are limited daily.
Book my free inspection